Objectives and hard constraints

When you use sequential optimization, you choose which objectives and constraints you want to include. You can populate these values directly in the Sequential Objectives table. Keep in mind the following:

  • Objectives for sequential optimization are not automatically scaled. If you use multiple objectives with different units of measure, you must define Weight values to make the objectives comparable.

  • Deviation-based objectives, such as those used for infeasibility diagnosis, do have automatic internal scaling.

  • The "Percent of Demand Served" objective is on the scale of [0,1]. It is normalized to 1 rather than 100.

The following table lists which of the objectives available for sequential optimization are considered objectives vs. hard constraint violations. If you want to identify which constraints are being violated when a model is infeasible, you can select those objects that are identified as “Constraints”:

Category Name Description Unit Measure List of Relevant Fields
Objectives
Financial Total Revenue The total revenue generated by units shipped to customers. Monetary value Source, Destination, Product, Mode, Period
  Total Profit The total profit of the optimization network and inventory structure. Monetary value Site, Source, Destination, Product, Mode, Asset, Period
  Total Cost The total network costs incurred by optimization. Monetary value Site, Source, Destination, Product, Mode, Asset, Period
  Total Transportation Cost The total cost of transporting units between sites in the network. Monetary value Source, Destination, Product, Mode, Period
  Total TPAsset Cost The total cost of all transportation assets in the network. Monetary value Source, Destination, Mode, Asset, Period
  Total Fixed Operating Cost The total cost to keep facilities and work centers in the network functional. Monetary value Site, Asset, Time
  Total Production Cost The total cost of producing units in the network. Monetary value Site, Source, Destination, Product, Period
  Total Fixed Startup Cost The total fixed startup cost incurred in the network. Monetary value Site, Asset, Period
  Total Closing Cost The total closing cost incurred in the network. Monetary value Site, Asset, Period
  Total Inventory Cost The total cost of holding inventory at the sites in the network. Monetary value Site, Product, Mode, Period
  Total InTransit InvCost The total cost for inventory that is held in transit for the network. Monetary value Source, Destination, Product, Mode, Period
  Total Warehousing Cost The total of all warehousing costs (inbound and outbound). Monetary value Source, Destination, Product, Mode, Period
  Total Inbound Warehousing Cost The total warehousing and process cost for inbound inventory in the network. Monetary value Source, Destination, Product, Mode, Period
  Total Outbound Warehousing Cost The total warehousing and process cost for outbound inventory in the network. Monetary value Source, Destination, Product, Mode, Period
  Total Sourcing Cost The total cost of sourcing products from facilities. Monetary value Source, Destination, Product, Mode, Time
  Total Capital Investment Cost The total capital investment incurred for facilities and work centers. Monetary value Site, Asset, Period
  Penalty Cost The total cost incurred for early, late and unserved demand. Monetary value Source, Destination, Product, Mode, Period
  Total Duty Cost The total cost from taxes and tariffs levied on shipments. Monetary value Source, Destination, Product, Mode, Period
  Total Expression Based Cost The total cost incurred through Expression Based Costs. Monetary value Expression
  Total Work Resource Cost The total fixed and variable cost incurred from use of work resources. Monetary value Site, Asset, Period
  Customer Revenue The total revenue based on the customer demand quantity served. Monetary value Source, Destination, Mode, Asset, Period
Service Percent of Demand Served The percentage of demand that is served out of the total demand in the model. This value is on the scale of [0,1] - it is normalized to 1 instead of 100. % of Quantity Source, Destination, Product, Mode, Period
  Total Weighted Transportation Distance The total transportation distance accounting for flow. Flow Units * Distance Source, Destination, Product, Mode, Period
  Total Weighted Transportation Time The total transportation time accounting for flow. Flow Units * Time Source, Destination, Product, Mode, Period
Sustainability Total CO2 Cost

The total cost of CO2, taking into account the Carbon Cost in the Greenhouse Gases table.

Monetary Value Site, Source, Destination, Product, Mode
  Total CO2 The total CO2 emissions. Carbon amount Site, Source, Destination, Product, Mode
Logistics Total Transportation Assets The total number of transportation assets used. # of Transportation Assets Source, Destination, Asset, Mode, Period
  Total Work Resources The total number of work resources used. # of Work Resources Site, Asset, Period
  Facility Set The number of total opened facilities with a Status of "Consider" # of Facilities Site, Period
  Work Center Set The number of total opened work centers with a Status of "Consider" # of Work Centers Site, Period, Asset
Risk Total Network Risk The weighted average aggregated risk across all the facilities in the network Risk score Product
Constraints
For Constraints, the solver attempts to minimize the deviation as defined in the Description. These deviations are the Diagnostic Deficit and Diagnostic Excess in the Network Optimization output Constraint Summary.
Flow Flow Count Deviation from the requirement in the Flow Count Constraints table Count Source, Destination, Product, Mode, Type, Period
  Flow Deviation from the requirement in the Flow Constraints table Constraint Basis (Quantity, Volume, Weight) Expression
  Flow Transportation Modes Deviation from requirements of Transportation Policies table when Transportation Policy is set to Flow Quantity Source, Destination, Product, Mode, Period
  Lead Time x Flow Deviation from maximum limit of the flow times the lead time from Products table (Max of Lead Time x Flow) Flow Units * Time Product, Period
Inventory Inv Count Deviation from the requirement in the Inventory Count Constraints table Count Site, Product, Type, Period
  Inventory Deviation from the requirement in the Inventory Constraints table Constraint Basis (Quantity, Volume, Weight) Expression
  Maximum Inventory Deviation from the requirement in the Inventory Policies table: Max Inventory Constraint Basis (Quantity, Volume, Weight) Site, Product, Period
  Minimum Inventory Deviation from the requirement in the Inventory Policies table: Min Inventory Constraint Basis (Quantity, Volume, Weight) Site, Product, Period
  Safety Stock Deviation from the requirement in the Inventory Policies table: Safety Stock Constraint Basis (Quantity, DOS) Site, Product, Period
  Dwell Time Deviation from the requirement in the Inventory Policies table: Min Dwell Time, Max Dwell Time Quantity Site, Product, Period
  Inventory Process Deviation from the requirement in the Inventory Process Constraints table. Quantity Expression
Production Production Count Deviation from the requirement in the Production Count Constraints table Count Site, Product, Type, Period
  Production Deviation from the requirement in the Production Constraints table Constraint Basis (Quantity, Volume, Weight) Expression
  Maximum Production Quantity Deviation from the maximum production quantity constraints (created when you select "Enforce integer number of production lots" option in Optimization Options on the Modeling Options tab) Quantity Site, Source, Destination, Product, Process, Period
  Minimum Order Quantity Deviation from the minimum order quantity constraints (created when you select "Enforce integer number of production lots" and "Use lot size as minimum order quantity" options in Optimization Options on the Modeling Options tab) Quantity Site, Source, Destination, Product, Process, Period
  Production Process Deviation from the requirement in the Production Process Constraints table. Quantity Expression
Expression Expression Deviation from the requirement in the Expression Constraints table Constraint Basis (Quantity, Volume, Weight) Expression
Sourcing Site Product Single Sourcing Deviation from the site product single sourcing constraints from the Sourcing Policies tables (Site Sourcing Policies, Customer Sourcing Policies), when Sourcing Policy is set to Single Source Count (# of Sources) Site, Product, Period
  Site Single Sourcing Deviation from site single sourcing constraints from the Sites table, when Single Site Sourcing is set to Yes Count (# of Sources) Site, Period
  Fractional Transportation Modes Deviation from requirements in the Transportation Policies table, when the Mode Rule is Probability or Split By Ratio Quantity Source, Destination, Product, Mode, Period
  Fractional Sourcing Deviation from requirements in the Sourcing Policy tables (Site Sourcing Policies, Customer Sourcing Policies), when Sourcing Policy is Multiple Sources (Probability) or Multiple Sources (Split By Ratio) Quantity Site, Product, Period
  Sourcing Process Deviation from the requirement in the Sourcing Process Constraints table. Quantity Expression
Production Policy Selection BOM Single Sourcing Deviation from requirements in the Bill Of Material Assignments table when Assignment Policy is set to Single BOM Count (# of Sources) Site, Product, Period
  BOM Fractional Sourcing Deviation from requirements in the Bill Of Material Assignments table when Assignment Policy is set to Split by Probability or Split by Ratio Quantity Site, Product, Period
  Make Processes Single Sourcing Deviation from requirements in the Production Process Assignments table when Routing Policy is set to Single Process Count (# of Sources) Site, Product, Period
  Make Processes Fractional Sourcing Deviation from requirements in the Production Process Assignments table when Routing Policy is set to Split by Probability or Split by Ratio Quantity Site, Product, Period
  Make Process Flow Fractional Destination Deviation from the requirements in the Production Process Steps table when Routing Policy is set to Single Route Quantity Site, Source, Product, Process, Period
  Make Process Flow Single Destination Deviation from the requirements in the Production Process Steps table when Routing Policy is set to Multiple Routes (Probability) Count Site, Source, Product, Process, Period
  Process BOM Connection Deviation from the requirement in the Bill Of Material Assignments table when Assignment Policy is set to Link to Process Quantity Site, Product, Process, Period
  Single Process Deviation from the requirement in the Production/Transportation/Sourcing/Inventory/Return Process Assignments table when Assignment Policy is set to Single Process # of Processes under one process type Source, Destination, Site, Product, Mode, Process, Period
  Single Process Step Deviation from the requirement in the Production/Transportation/Sourcing/Inventory/Return Process Step table when Routing Policy is set to Single Route # of Process Steps after one specific process step Source, Destination, Site, Product, Mode, Process, Period
  Fractional Process Constraints Deviation from the requirement in the Production/Transportation/Sourcing/Inventory/Return Process Step table when Routing Policy is set to Multiple Routes (Probability) Quantity Source, Destination, Site, Product, Mode, Process, Period
  Process Step Balance Constraints   Quantity Source, Destination, Site, Product, Mode, Process, Period
  Process To Process Relation Deviation from the requirement in the Production/Transportation/Sourcing/Inventory/Return Process Assignments table when Assignment Policy is set to Link to Process Quantity Source, Destination, Site, Product, Mode, Process, Period
Returns Return Process Deviation from the requirement in the Return Process Constraints table. Quantity Expression
  Single Return Destination Constraints Deviation from Return Policies table, when Return Policy is set to "Single Destination" Count (# of Destination) Destination, Product, Period
  Fractional Return Destination Constraints Deviation from Return Policies table, when Return Policy is set to "Split by Ratio" or "Split by Probability" Quantity Destination, Source, Product, Period
  Return Flow Balance Constraints Deviation from the requirement Return Rate and Return Quantity Return Product Ratios Quantity Destination, Product, Period
Demand Demand Deviation from requirements in the Customer Demand table Quantity Site, Product, Period
  Site Demand Deviation from requirements in the Site Demand table Quantity Site, Product, Period
  Demand Mode/Due Date Deviation from requirements in the Demand table (with Due Date and/or Mode) Quantity Site, Product, Mode, Period
Site & Work Center Site Count Deviation from the requirement in the Site Constraints table Count Site, Type, Period
  Site Throughput Capacity Deviation from requirements in the Sites table based on Max Throughput Capacity Basis (Quantity, Volume, Weight) Site, Period
  Work Center Count Deviation from the requirement in the Work Center Constraints table Count Site, Type, Asset, Period
  Work Center Throughput Capacity Deviation from requirements in the Work Centers table based on Max Throughput Capacity Basis (Quantity, Volume, Weight) Site, Asset, Period
  Open Close Relation Deviation from the requirements in the Open/Close Relations constraints Count Source, Destination, Asset, Period
Service Requirement End to End Distance Service Deviation from the End To End Service Constraints table based on Max Distance Quantity Source, Destination, Product, Mode
  End to End Time Service Deviation from the End To End Service Constraints table based on Maximum Lead Time Quantity Source, Destination, Product, Mode
Service Constraint Last Mile Distance Service Deviation from the Last Mile Service Constraints table based on the Distance and Percentage Constraint Basis (Quantity, Cubic, Weight) Period, Source, Destination, Product, Mode
  Last Mile Time Service Deviation from the Last Mile Service Constraints table based on the Time and Percentage Constraint Basis (Quantity, Cubic, Weight) Period, Source, Destination, Product, Mode
Shelf Life Shelf Life flow Deviation from the requirements in the Products table based on Shelf Life Quantity Site, Product, Period
  Shelf Life inventory Deviation from the requirements in the Products table based on Shelf Life Quantity Site, Product, Period
Transportation Transportation Process Deviation from the requirement in the Transportation Process Constraints table Quantity Expression
Transportation Assets Minimum Asset Units Deviation from the minimum required number of assets (calculated internally using transportation time) # of Assets Asset, Period
  Maximum Asset Units Deviation from the maximum available transportation assets from the Transportation Assets table based on Units # of Assets Asset, Period
  Maximum Number of Transportation Asset Deviation from the maximum allowable transportation assets # of Assets Asset, Period
Work Resources Minimum Work Resource Units Deviation from the minimum required number of work resources (calculated internally using the work resource usage hours) # of Work Resources Site, Asset, Period
  Maximum Work Resource Units Deviation from the maximum available work resources from the Work Resources table based on Units # of Work Resources Site, Asset, Period
Expansion Site Expansion Requirement Deviation from requirements in the Sites table where Expansion Only is set to Yes Count Site, Period
  Asset Expansion Requirement Deviation from requirements in the Transportation Assets table where Expansion Only is set to Yes Count Asset, Period
  Work Center Expansion Requirement Deviation from requirements in the Work Centers table where Expansion Only is set to Yes Count Site, Asset, Period
  Work Resource Expansion Requirement Deviation from requirements in the Work Resources table where Expansion Only is set to Yes Count Site, Asset, Period
Spatial Maximum Site Expansion Deviation from the Max Floor Expansion in the Sites table. Area Site
  Minimum Site Expansion Deviation from the Min Floor Expansion in the Sites table. Area Site
  Maximum Storage Space Expansion Deviation from the Max Floor Expansion in the Site Storage Spaces table. Area Site, Storage Space
  Minimum Storage Space Expansion Deviation from the Min Floor Expansion in the Site Storage Spaces table. Area Site, Storage Space
  Maximum Shipping Space Expansion Deviation from the Max Floor Expansion in the Site Shipping Spaces table. Area Site, Shipping Space
  Minimum Shipping Space Expansion Deviation from the Min Floor Expansion in the Site Shipping Spaces table. Area Site, Shipping Space
CO2 Emission Maximum Carbon Footprint Deviation from the maximum allowable carbon footprint from the Greenhouse Gases table based on Maximum Carbon Footprint Carbon amount N/A
  Carbon Offset Maximum Deviation from the maximum allowable carbon footprint from the Greenhouse Gases table based on Carbon Offset Maximum Carbon amount N/A
  Carbon Offset Minimum Deviation from the maximum allowable carbon footprint from the Greenhouse Gases table based on Carbon Offset Minimum Carbon amount N/A
Investment Maximum Capital Investment Deviation from the maximum capital investment from the Optimization Options Maximum Capital Investment value Monetary Value N/A
Risk Maximum Network Risk Deviation from the Maximum Network Risk value specified in Network Optimization Options Risk score N/A
  Maximum Product Risk Deviation from the maximum product risk value specified by the Maximum Risk column in the Products table Risk score Product