Work Resources Multi-Period
Internal Table Name: WorkResources_MultiPeriod
Period Name
Technology: NO IO S
Table: WorkResources_MultiPeriod
Internal Name: PeriodName
Type: Short Text (50)
Select the time period in which the changes to the work resource will occur.
Site
Technology: NO IO S
Table: WorkResources_MultiPeriod
Internal Name: SiteName
Type: Short Text (100)
Specify the site where this resource is used during this period.
Name
Technology: NO IO S
Table: WorkResources_MultiPeriod
Internal Name: WorkResourceName
Type: Short Text (100)
Select the name for the work resource which will change during this time period.
Units
Technology: NO IO S
Table: WorkResources_MultiPeriod
Internal Name: Units
Type: Short Text (25)
Enter the number of identical units of this resource available to perform work during this time period. It must be a whole number.
Fixed Resource Cost
Technology: NO IO S
Table: WorkResources_MultiPeriod
Internal Name: UnitFixedCost
Type: Short Text (50)
Enter the fixed unit cost for each work resource during this period. This is the fixed cost of a work resource, such as the general/administrative costs per worker for the period.
Hourly Cost
Technology: NO
Table: WorkResources_MultiPeriod
Internal Name: HourlyCostCap
Type: Short Text (50)
Specify the cost per hour for this resource during this period. You can also define a step function when cost varies by step level.
Maximum Capacity (Hours)
Technology: S
Table: WorkResources_MultiPeriod
Internal Name: WorkResourceMaxAvailableTimeinHours
Type: Number (Float)
Enter the maximum time (in hours) that each work resource can be utilized during this period.
Notes
Technology: NO IO S
Table: WorkResources_MultiPeriod
Internal Name: WorkCenterPeriodNotes
Type: Memo
Enter optional descriptive notes about the work resource.