Work Resources

Internal Table Name: WorkResources

Simulation: Currently only used with Production Processes in the Simulation problem type.

Name

Technology: NO S

Table: WorkResources

Internal Name: WorkResourceName

Type: Short Text (100)

Enter a unique name for your work resource.

Site

Technology: NO S

Table: WorkResources

Internal Name: SiteName

Type: Short Text (100)

Specify the site where this resource is used.

Units

Technology: NO S

Table: WorkResources

Internal Name: Units

Type: Short Text (25)

Enter the number of identical units of this resource available to perform work. It must be a whole number.

Default: 1

Fixed Resource Cost

Technology: NO S

Table: WorkResources

Internal Name: UnitFixedCost

Type: Short Text (50)

Enter the fixed unit cost for each work resource. This is the fixed cost of a work resource, such as the general/administrative costs per worker for the horizon of the model.

If you do not specify a Fixed Resource Cost on Work Resources, the optimized number of units will always equal the number of Units set on the Work Resources input table. The Work Resource Utilization in the Work Resource Summary optimization output table will therefore be reported as 1 (fully utilized).

The Fixed Resource Cost is reflected in the Total Work Resource Cost in the Network Summary output tables.

Default: 0

Hourly Cost

Technology: NO

Table: WorkResources

Internal Name: HourlyCostCap

Type: Short Text (50)

This is the hourly cost of a work resource. Generally, it is used for the hourly wages of workers. Specify the capacity and cost structure per hour for this resource. Use the Capacity/Fixed Cost Period column to control the period to which the Hourly Cost applies. In order for your model to run correctly, the Cost should increase as the Capacity increases, for example:

If you do not specify a Fixed Resource Cost on Work Resources, the optimized number of units will always equal the number of Units set on the Work Resources input table. The Work Resource Utilization in the Work Resource Summary optimization output table will therefore be reported as 1 (fully utilized).

The Hourly Cost is reflected in the Total Work Resource Cost in the Network Summary output tables.

Expansion Only

Technology: NO

Table: WorkResources

Internal Name: ExpansionOnly

Type: Bit

One of Yes, No. (Actual database values are 1,0.)

If set to Yes, then the available number of resources cannot be less than any previous period.

Default: No

Maximum Capacity (Hours)

Technology: NO

Table: WorkResources

Internal Name: WorkResourceMaxAvailableTimeinHours

Type: Number (Float)

Enter the maximum time (in hours) that each work resource can be utilized. Use the Capacity/Fixed Cost Period column to control the period to which the Maximum Capacity (Hours) applies.

Capacity/Fixed Cost Period

Technology: NO

Table: WorkResources

Internal Name: FixedCostPeriod

Type: Short Text (50)

One of Period Length, Day, Week, Month (30 Day), Quarter (91 Day), Year.

Select the period to which the Maximum Capacity (Hours) and Hourly Cost fields apply. If you populate the value with "Horizon", "PeriodLength" will be used when solving the model.

Waiting Consumer Queue Basis

Technology: S

Table: WorkResources

Internal Name: WaitingConsumerQueueBasis

Type: Short Text (50)

One of None, Item, Quantity, Weight, Volume, Value.

Specify the unit by which the consumer queue is reported, either by item, quantity, weight, volume, or value.

Default: None

Notes

Technology: NO S

Table: WorkResources

Internal Name: WorkResourceNotes

Type: Memo

Enter optional descriptive notes about the work resource.

Custom 1

Technology: NO S

Table: WorkResources

Internal Name: Custom1

Type: Short Text (255)

Optional field to enter descriptive information.

Custom 2

Technology: NO S

Table: WorkResources

Internal Name: Custom2

Type: Short Text (255)

Optional field to enter descriptive information.

Status

Technology: NO S

Table: WorkResources

Internal Name: Status

Type: Type: Short Text (50)

One of Include, Exclude

Choose the Work Resource status:

  • Include - This Work Resource will be included in a solver run.
  • Exclude - This Work Resource will be excluded from a solver run.

Default: Include