Use the Sourcing Process Assignments table to create rules for selecting which Sourcing Process to use when multiple processes are available. You can also link a process to another process. In addition, this table enables you to determine which processes can be used in which periods.
Simulation: Available only in Classic Simulation.
Period
Technology: NO S
Table: SourcingProcessAssignments
Internal Name: PeriodName
Type: Short Text (50)
Select one of:
- the specific Period to which the Sourcing Process Assignment applies,
- (ALL_Periods) to apply the assignment to the complete model horizon,
- the Period group to which the Sourcing Process Assignment applies in a multi-period model.
Period assignments work as follows:
- (ALL_Periods) only assignment – The process is assigned to the entire horizon of the model. In a multi-period model, the assignment is for all periods.
- (ALL_Periods) with additional period assignments – The horizon-level record (ALL_Periods) sets the basis for the assignment policy and costs. Period-specific assignments override the horizon assignment for the period specified.
- Period-Specific Assignments Only – The process is assigned to the periods specified and unavailable in other periods. If there is no process assignment defined in a period, the model can still produce and source the product; it does so without using a process. For example, if you define an Sourcing Process Assignment for Period 1 only, the product will still be produced and sourced in the other periods, but without the specific Sourcing Process.
Location
Technology: NO S
Table: SourcingProcessAssignments
Internal Name: SiteName
Type: Short Text (100)
Select the site or site group, or customer or customer group, for which the Sourcing Process Assignment applies.
Product
Technology: NO S
Table: SourcingProcessAssignments
Internal Name: ProductName
Type: Short Text (100)
Select the product or product group for which the Sourcing Process Assignment applies.
Source
Technology: NO S
Table: SourcingProcessAssignments
Internal Name: SourceName
Type: Short Text (100)
Select the source site or group for which the Sourcing Process Assignment applies.
Process
Technology: NO S
Table: SourcingProcessAssignments
Internal Name: ProcessName
Type: Short Text (100)
Select the process for which the Sourcing Process Assignment applies.
Assignment Policy
Technology: NO S
Table: SourcingProcessAssignments
Internal Name: SelectionRule
Type: Short Text (255)
Select the Assignment Policy that determines how the Sourcing Process Assignments will be used. Each site-product pair must have the same Assignment Policy for all process options. Some Assignment Policies are affected by the value of Policy Parameter:
Assignment Policy | Description |
None | No specific assignment policy is applied. |
Single Process | Network Optimization only: Use this assignment Policy if there is only one Sourcing Process Assignment that can be used for production, based on the Site-Product-Source combination. If insufficient capacity exists to serve all throughput with a single process, the model may be infeasible. This rule introduces a binary constraint which can lead to increased model run time. |
Split by Ratio |
The Policy Parameter value is used to establish a ratio between the records to be used, which in turn drives how Sourcing Process Assignments are divided. This rule adds a constraint to the model, to force the process selection to use the split defined.
This rule adds a constraint to the model, to force the process selection to use the split defined. You can express the Policy Parameter as 0 to 100, or 0 to 1. For example, values of 25 and 75 are evaluated the same as values of .25 and .75. |
Split by Probability |
Sourcing Process Assignments are divided according to the percentages specified in the Policy Parameter field.
You can express the Policy Parameter as 0 to 100, or 0 to 1. For example, values of 25 and 75 are evaluated the same as values of .25 and .75. |
Link to Process |
Optimization only: This rule forces the process to link to another process, removing the independent selection of a process. The process assignment Policy will, in turn, dictate the rule for process selection. This rule is used only when multiple processes are present. Only Sourcing Processes are available when linking from a Sourcing Process Assignment. |
First Available | Simulation only: The Sourcing Process which becomes available first is used. |
Default: None
Policy Parameter
Technology: NO S
Table: SourcingProcessAssignments
Internal Name: SelectionParameter
Type: Short Text (255)
This field is used in conjunction with the "Split by Ratio", “Split by Probability”, and “Link to Process” Assignment Policies.
- Split by Ratio – Define the ratio between multiple processes on the same Site-Product combination. These are then used to generate the proportional split. For example, if you have two processes that can be used with a “Split by Ratio”, you could define the Policy Parameters as 6 for one record and 2 for the other. Based on the ratio between these two values, the Sourcing Process Assignment would be 75% for the first record and 25% for the second.You can express the Policy Parameter as 0 to 100, or 0 to 1. For example, values of 25 and 75 are evaluated the same as values of .25 and .75.
- Split by Probability – the assignment is chosen based on the percentages set in the Policy Parameter field:
- If the value is non-zero, use the exact value. For example, if you enter 50, then 50% uses this record. The Policy Parameter values should add up to 100, which represents 100%, however if the inputs do not add up to 100, the values will be scaled to 100 automatically.
- If the value is 0, this is treated as 0% and this record is not considered (similar to setting Status = “Exclude”).
- If the value is null, this record is considered “free”. In the case that all records with non-zero parameter values add up to less than 100%, the solver can determine the percentage for any free records. In the case that the non-zero parameter records add up to 100%, the free records are not considered (similar to Status = “Exclude”).
You can express the Policy Parameter as 0 to 100, or 0 to 1. For example, values of 25 and 75 are evaluated the same as values of .25 and .75. - Link to Process – Enter the name of the process to which the current process is linked. Only Sourcing Processes are available when linking from a Sourcing Process Assignment.
Default: 1
Status
Technology: NO S
Table: SourcingProcessAssignments
Internal Name: Status
Type: Short Text (25)
One of Include, Exclude.
Choose the Sourcing Process Assignment status:
- Include - This Sourcing Process Assignment is to be included in a simulation or optimization run.
- Exclude - This Sourcing Process Assignment is to be excluded from a simulation or optimization run.
Default: Include
Notes
Technology: NO S
Table: SourcingProcessAssignments
Internal Name: Notes
Type: Memo
Enter optional descriptive notes about the Sourcing Process Assignment.