Production Process Flows
Internal Table Name: OptimizationOutputProductionProcessFlows
This output table summarizes the specifics of all production process flows in the network.
Scenario
Table: OptimizationOutputProductionProcessFlows
Internal Name: Not Applicable (Scenario column not in table)
The scenario for which the summary data was generated.
Period Name
Table: OptimizationOutputProductionProcessFlows
Internal Name: PeriodName
The period in which this flow occurs.
Site Name
Table: OptimizationOutputProductionProcessFlows
Internal Name: SiteName
The site at which the process occurred.
Product Name
Table: OptimizationOutputProductionProcessFlows
Internal Name: ProductName
The name of the product being produced.
Process Type
The type of process used with the production process for this flow
Process Name
Table: OptimizationOutputProductionProcessFlows
Internal Name: ProcessType
The name of the process.
Process Step Name
Table: OptimizationOutputProductionProcessFlows
Internal Name: ProcessStepName
The name of this process step.
Next Process Step Name
Table: OptimizationOutputProductionProcessFlows
Internal Name: NextProcessStepName
The process step that occurs after the Process Step Name.
Work Center Name
Table: OptimizationOutputProductionProcessFlows
Internal Name: WorkCenterName
The name of the work center, if applicable, used by the process.
Work Resource Name
Table: OptimizationOutputProductionProcessFlows
Internal Name: WorkResourceName
The name of the work resource, if applicable, used by the process.
Flow Units
Table: OptimizationOutputProductionProcessFlows
Internal Name: FlowUnits
The number of units handled in this process flow.
Flow Weight
Table: OptimizationOutputProductionProcessFlows
Internal Name: FlowWeight
The weight of all units handled in this process flow.
Flow Cubic
Table: OptimizationOutputProductionProcessFlows
Internal Name: FlowCubic
The cubic size of all units handled in this process flow.
Flow Cost
Table: OptimizationOutputProductionProcessFlows
Internal Name: FlowCost
The total cost involved this flow.
flow cost = total number of flow units * unit process cost
Setup Cost
Table: OptimizationOutputProductionProcessFlows
Internal Name: SetupCost
The total cost involved in setting up this process.
setup cost = (total number of flow units * setup cost from Process Steps table) / lot size
Total Cost
Table: OptimizationOutputProductionProcessFlows
Internal Name: TotalCost
The total cost incurred for the production process flows of the product at the site in the specified period.
Process Time
Table: OptimizationOutputProductionProcessFlows
Internal Name: ProcessTime
This is the time incurred when work centers are utilized for the production process flows of the product at the site in the specified period.
Changeover Time
Table: OptimizationOutputProductionProcessFlows
Internal Name: ChangeoverTime
The time incurred during work center changeovers required for the process.
Work Resource Time
Table: OptimizationOutputProductionProcessFlows
Internal Name: WorkResourceTime
The time incurred in hours when work resources are utilized.
Period No
Table: OptimizationOutputProductionProcessFlows
Internal Name: PeriodNo
The sequence number for the period. This value is useful in sorting periods sequentially rather than by name.
Scenario ID
Table: OptimizationOutputProductionProcessFlows
Internal Name: ScenarioID
The identifier of the scenario for which the summary data was generated.
Sub-Scenario ID
Table: OptimizationOutputProductionProcessFlows
Internal Name: StepNumber
The identifier of the sub-scenario, if applicable, for which the summary data was generated.
Last modified: Wednesday May 15, 2024